LSSK / LOGIC SYNTHESIS SCHOOL KIT

Kit 4 / 6 · one learner or pair

Two-request round-robin arbiter

A four-core-IC arbiter with requests, grants, retained priority, a slow assembled clock.

Download CSVExercise catalogue
$16.90estimated component cost
$29.96cost with packing, labor and allowances
$55.00suggested direct-sale price, before tax / delivery

Coverage: P04. One exercise is assembled at a time; the inventory is the maximum quantity of each component across those exercises, not the sum of all exercises.

In the box: 2 full-size boards, 3 button modules, 0 self-locking touch switches, 1 assembled clock generator, 1 LED bars (8 LEDs), 0 seven-segment displays, 80 M–M and 40 M–F jumpers. Other indicators and tools are itemized below.

Component inventory

ComponentQuantity (pieces)SourceUSD / pieceLine USD
CD4081: Quad 2-input AND gate1LSSK row 10$0.5500$0.55
CD4011: Quad 2-input NAND1LSSK row 12$0.3500$0.35
CD4071: Quad 2-input OR1LSSK row 20$0.2500$0.25
CD4013: Dual D flip-flop1LSSK row 3$0.3500$0.35
Full-size solderless breadboard (830-point class)2LSSK row 45 · Part / supplier$3.0000$6.00
Breadboard regulator module, output set to 5 V1LSSK row 56 · Part / supplier$1.0000$1.00
USB-to-barrel boost cable, marked 9 V1LSSK row 57 · Part / supplier$1.1700$1.17
Insulated IC extractor1LSSK row 53 · Part / supplier$1.2000$1.20
Individual 3-pin button module with embedded pull resistor3
Allocated from supplier lots of 5
LSSK row 66 · Part / supplier$0.4060$1.22
8-channel 5 V current-limited LED module1LSSK row 62 · Part / supplier$0.3775$0.38
Assembled 555 clock module, blue1LSSK row 54 · Part / supplier$0.5300$0.53
Male–male jumper, 10–15 cm80
2 full packs × 40
LSSK row 70 · Part / supplier$0.0325$2.60
Male–female jumper, 10–15 cm40
1 full packs × 40
LSSK row 71 · Part / supplier$0.0325$1.30

Cost and selling-price estimate

ItemUSD / kitBasis
Components$16.90Sum of rounded line extensions below / in CSV
Inbound freight and procurement allowance$2.5415% of components
Loss / replacement allowance$0.855% of components
Packaging, labels and printed insert$3.00Planning allowance
Picking, packing and QA labor$6.6720 minutes at $20/hour; validate on a pilot batch
Loaded cost$29.96Components + all above allowances
Suggested direct-sale price$55.00ceil((loaded cost / (1 − 0.40 − 0.03)) / 5) × $5
Payment fee at suggested price$1.653% of retail
Contribution after fee and loaded cost$23.3942.53% of retail; before fixed business overhead
Loaded cost sensitivity$24.88–$40.09Component prices −25% to +50%; same labor and packaging

USD planning model, source snapshot 14 October 2026. Spreadsheet prices are not live quotes; several are bulk/lot prices. CSV and HTML use the same Decimal calculations. Per-piece normalization preserves four decimals; line extensions round to cents before summation. Prices exclude customer delivery, sales tax, marketplace commissions above the assumed 3%, curriculum-development costs, insurance and fixed business overhead. A USB 5 V source and multimeter are supplied by the classroom. For a standalone retail bundle, add quotes for those before repricing.

Four logic ICs, one bit of scheduling history

Let p=0 prefer requester 0 and p=1 prefer requester 1 when both request. Each rising edge of the assembled clock accepts the visible grant. There is no separate downstream ready signal in this exercise.

g0 = r0 AND (NOT r1 OR NOT p)
g1 = r1 AND (NOT r0 OR p)
p_next = g0 OR (p AND NOT (r0 OR r1))
RESET: p = 0

When both request, accepting g0 makes p=1; accepting g1 makes p=0. With no requests, priority is retained. With one request, that request wins regardless of priority. These are combinational grants for the upcoming sampling edge; after the edge, the displayed grants may immediately change to the next decision.

r0 r1g0 g1 if p=0g0 g1 if p=1Next priority
000000Hold p
0101010
1010101
111001Toggle p

Gate allocation: CD4011 supplies three inversions by joining each NAND’s two inputs (¬r0, ¬r1, ¬(r0∨r1)). CD4071 supplies four OR gates (r0∨r1, the two grant conditions, and the next-state merge). CD4081 supplies three AND gates (g0, g1, and idle hold). One half of CD4013 stores p and supplies both p and ¬p. Thus the advertised four core packages are sufficient.

Connect p_next to 4013 D, the assembled 555 module OUT directly to CLK, RESET to its active-high reset, and SET to GND. Buttons are r0, r1 and RESET. Set the clock near 0.5–1 Hz and change requests between rising edges.

Check the behavior

  1. Reset: p=0. Both requests low must give no grant.
  2. Exercise each single request with both possible p values.
  3. Hold both requests high for eight clock cycles. Record the grant just before each rising edge: 0,1,0,1,0,1,0,1.
  4. Insert three idle clock cycles; confirm that the next contested decision retains the saved priority.
  5. For every cycle check NOT(g0 AND g1), g0 → r0 and g1 → r1.

The accompanying software checks exhaust all input/state combinations and persistent-request traces. They verify these equations; physical operation still requires the pilot build.

Quantity and sourcing assumptions

Source register, quantities and pricing assumptions. LSSK component spreadsheet